Opportunities

SPN – Tanzania – Procurement of Plant Design, Supply, Installation, Testing and Commissioning of 49.5MW Malagarasi Hydropower Plant and 132kV evacuation Transmission Line, from Malagarasi Hydropower site to Kidahwe 4000/132/33 kV substation(Lot 1 & Lot 2)

0

[]
SPN – Tanzania – Procurement of Plant Design, Supply, Installation, Testing and Commissioning of 49.5MW Malagarasi Hydropower Plant and 132kV evacuation Transmission Line, from Malagarasi Hydropower site to Kidahwe 4000/132/33 kV substation(Lot 1 & Lot 2) | African Development Bank – Building today, a better Africa tomorrow ]]]]]]>]]]]>]]> ]]]]]]>]]]]>]]> ]]]]]]>]]]]>]]>

Source

Seychelles: President arrives in Addis Ababa Ethiopia for the 35th Ordinary Session of the Assembly of African Union (AU)

Previous article

Mzansi’s best budget bush breaks

Next article

You may also like

Comments

Comments are closed.