Prime location in Limpopo’s mining hub: The proposed Fetakgomo-Tubatse SEZ (FTSEZ) is located in the south-east of the Limpopo Province of South Africa.

The Fetakgomo-Tubatse Special Economic Zone received from the Limpopo Department of Economic Development, Environment and Tourism an allocation of R35-million (FY 2021/22) which was earmarked for the following activities and projects:

  • District Skills Audit,
  • environmental impact assessments (EIAs),
  • township establishment (land rezoning),
  • engineering designs and costing for the perimeter fence,
  • site clearance,
  • Eskom cost estimation and acceptance of quote,
  • engineering designs for an Eskom switching station,
  • water allocations (assessment of demand per industry),
  • an Implementation Readiness Study and
  • engineering designs.

The whole R35-million is committed to the enlisted projects.

Existing and current projects in the District
Project Value Responsible Institution Status
Steelpoort Wastewater Treatment Works R70-million DBSA/Sekhukhune District Municipality Existing WTW on private land. Construction at Steelpoort
Steelpoort Water Treatment Works R65-million DBSA Complete
Ga-Malekana Water Treatment Works upgrade R121-million Sekhukhune District Municipality Technical report approved; Planning stage
R37 and R555 main roads R2-billion SANRAL Underway
Steelpoort railway siding Not available Transnet Initiation phase
Regional External Master Plan R1.6-million Sekhukhune District Municipality Initiation phase
Steel Bridge upgrade R70-million Roads Agency Limpopo and mining companies Initiation phase
SEZ human settlement scoping report Not available CoGHSTA/HDA Underway

 

Why businesses locate in the FT-SEZ

The Fetakgomo-Tubatse SEZ provides a secure business environment and is designing a world-class manufacturing and logistics platform that will be positioned to support transportation efficiencies through road, rail and heliport connectivity to ports and border posts.

  • As part of the SEZ Master Plan, the environmental impact assessment (EIA) is expected to be ready for 2022.
  • A number of infrastructure new builds and upgrades are underway, including:
  • Security and site clearance
  • Extension of rail link to the SEZ industries and to the Musina-Makhado SEZ (Beit Bridge)
  • Electricity substation designs underway for substation
  • Upgrading of R37 and R555 roads
  • Building of new steel bridge
  • Engineering works for piping water from the De Hoop Dam to the SEZ site
Benefits for businesses located in the FTSEZ
  • Enabling infrastructure and warehouses
  • Close proximity to mining operations
  • Carbon credits
  • Reduced carbon tax
  • Reliable and low-carbon green energy
  • Global leadership in production of chrome and huge resources of platinum group metals
  • Land and security
  • State-of-the-art top infrastructure
  • Water provision
  • Reliable road and rail network

The 348-million cubic metre capacity De Hoop Dam ensures reliable water supply for investors in the Special Economic Zone.

Generic SEZ incentives
  • Vat and customer relief
  • Employment tax incentives
  • Building allowance
  • Reduced corporate income tax (15% corporate tax)
  • 12i tax allowance and incentives
  • One Stop Shop Facility
Distances to key points
  • Port of Maputo (Mozambique) – 380 km
  • Port of Richards Bay – 600 km
  • Musina Beit Bridge Border Post – 400 km

The Mining Inputs Supplier Park has more than 11 000 m² of industrial space available now with a further 130 000 m² of land available for development and ready for top structures to be installed. Water, roads and electricity are in place.

For more information, contact Fetakgomo-Tubatse SEZ PMU below:

Source

AMI – Sénégal – Assistance Technique (A.T) aux organisations de producteurs pour l’Agropole Sud

Previous article

Minister Gobin encourages local beekeepers to boost honey production

Next article

You may also like

Comments

Comments are closed.

More in News