The services under this assignment will comprise:
- Undertake the Feasibility Study (including Economic/Financial Analysis), ESIA, and preparation of Conceptual Engineering Designs including Technical Specifications for the 400kV Transmission Line from Kisongo – Same – Segera with associated Substations.
- Preparation of Tender Documents.
Comments