[]
EOI – Tanzania – Design Review, preparation of Bidding Documents and Construction Supervision, of the 49.5 MW Malagarasi Hydropower Plant and associated Transmission & Distribution lines in Kigoma | African Development Bank – Building today, a better Africa tomorrow ]]]]]]>]]]]>]]> ]]]]]]>]]]]>]]> ]]]]]]>]]]]>]]>
Source
EOI – Tanzania – Design Review, preparation of Bidding Documents and Construction Supervision, of the 49.5 MW Malagarasi Hydropower Plant and associated Transmission & Distribution lines in Kigoma

Comments