The objective of the assignment includes services but not limited to Design Administration and Lab block G+2 Floors, Workshop and lab block G+1 Floors, Jetty infrastructure, Swimming pool size 50x25m, External works including soft and hard landscaping, Conduct physical survey, collect all site data, and study/analyses data so as to facilitate carrying out the assignment; however, consultant is liable to verify the correctness of data in geotechnical investigation, Undertake site verification, topographical survey, Review all available data on topographic condition so as to incorporate in th
Comments