The Consultant shall review and update the 2018 feasibility studies to produce an updated feasibility study (including Environmental and Social assessments) and technical designs for the four (4) grid extension Lots approximately 677.21 km of medium voltage lines and 1842.78 km of low voltage (LV) reticulations namely: